体育彩票走势图500期|新疆时时彩票走势图
 
Current Location:Home >Manufacturing Center > X.J. Manufacturing Center cases
Manufacturing Center

Owning 4 professional factory, 50 modernized production lines and 10,000 workers, X.J. is ready for large-scale mass production. 

 

--Plastic injection

The daily output for one production line is 6,000pcs of plastic housing, lid and other accessories. Based on 200 injection machines, we are capable to produce huge quantity of plastic wares within short time.


-- Mould tooling

We can finish a mould tooling within 25 days averagely, which is quite quick among suppliers.


-- Hardware production

To make the housing or any other metal accessories, our daily output per shift is 50,000pcs. Thanks to enough machinery and enables us to produce hardware at the first available time.


-- Spray & painting

The daily output for one production line is 60,000pcs per shift.

 

-- Final assembling

The daily output for each final assembling line is 60,000pcs. Based on 50 modernized final assembling lines, our production capacity could reach 150,000~180,000pcs easily.

 

 

体育彩票走势图500期 那不勒斯四部曲豆瓣 皇家马德里对毕尔巴鄂竞技 英雄杀游戏 电音歌后在线客服 手机真钱捕鱼平台 波斯波利斯对吉达阿赫利2019 切尔西1-1狼队 30选5中奖规则 最火的网上棋牌 毕尔巴鄂桥叫什么名字